Archive for February, 2006

Wings, Fourth Week

Saturday, February 25th, 2006

February 19, 2006

Worked on mounting the Whelan combination strobe/navigation lights. Laid out the cut out areas on the wing tips and cut them with a hole saw and finished the openings with rotary rasp. Added longer ground wire to units .

8 hours

February 20, 2006
I cut the two navigation/strobe light lenses […]

Wings, third week

Saturday, February 18th, 2006

February 12, 2006

I decided to start installation of the landing lights. I had ordered two of the Duckworks lights from Van. Upon inspection I found the kit includes a automotive driving light, plexiglass lens, and aluminum brackets.

All that is used of the automotive light is the lense and bulb. I […]

Wings, second week

Saturday, February 11th, 2006

February 6, 2006
Drilled, deburred and dimpled right and left flap brackets.

10 hours

February 7, 2006
Used blind rivets to attach right and left flap brackets. Installed flaps.

10 hours

February 8, 2006
I checked and set he spacing between flaps/ ailerons and general alignment. It all looks good.

Drilled holes in the W413 aileron bracket to allow the flap […]

Start on the Wings

Saturday, February 4th, 2006

Note regarding this log: I thoroughly enjoy the time I am spending in my shop on this project. My progress is very slow, but I am trying to build the best RV7A that I can. Each day I recieve satisfaction knowing that the work I have accomplished for that day is based […]