Archive for January, 2007

Fuel Tank Attach. Brackets

Tuesday, January 30th, 2007

January 28, 2007

Today I installed the two forward fuel tank attach brackets. This was a little more time consuming than I had expected. Mainly because I took extra time to make sure I was locating them properly.

Aluminum lines

Saturday, January 27th, 2007

January 24-27, 2007

I painted the fuel valve pointer ( handle) red and installed the valve. Then I took on the dreaded task of installing the 3/8 inch fuel lines. I ended up scraping the first attempt on the line from valve to right tank. Drove to Airparts and bought new tubing. […]

Time out

Saturday, January 20th, 2007

January 10-19

I took a few days off from the RV7A project to help Dick with his Luscombe horizontal stabilizer rebuild. It was a real challenge, to say the least.

Brake Pedals

Saturday, January 13th, 2007

January 9, 2007

I had previously constructed the rudder pedal frame and brake pedals. Today I mounted the pedals on the frame along with the master brake cylinders. Had to do a bit of filing to get everything to fit properly. I then set the entire rudder pedal assembly in the fuselage and […]

Mounted Fuel Pump

Saturday, January 13th, 2007

January 8, 2007

Today I took a couple hours to install the boost fuel pump. One of the easier task on the project!

Aileron Trim

Saturday, January 6th, 2007

January1 and 2, 2007

I mounted the Ray Allen servo and hooked it up to the belcrank and to the aileron pushrod using the springs furnished with the trim kit. I thought I had been very careful in folllowing the instructions and mounted the servo accordingly. Unfortunately, after a day’s work, the trim was […]

Saturday, January 6th, 2007